Environment Matters in Greece: First Hydroelectric Power Grid

(GREEK NEWS AGENDA)          The island of Ikaria will soon be opting out of the national power grid, as it will become autonomous in terms of energy consumption. The foundation of the first hybrid system in Greece, which will combine hydroelectric and aeolian (wind) modes of energy production, is being laid on October 25. A hydroelectric station will be built that will utilise waterfall from three different levels. The water will begin from an existing dam in the area of Pezi on the island, located at a height of 700 metres. In Pezi, there is a natural plateau. A rain storm is enough to fill up the natural reservoir in the plateau. The water will then be collected in three separate cisterns that will be built, at different levels, thus creating artificial cataracts. These cataracts will produce electric energy, capable of covering 85-90% of the islands requirements. The barrages will each have a capacity of 80,000 cubic metres of water. Deputy Minister of Merchant Marine Panayiotis Kammenos will inaugurate the energy plant tomorrow.  Centre for Renewable Energy Resources: Hydroelectric Energy; Secretariat General of Information: About Brand Greece – Environmental Strategic Policies  & Energy Policy; Public Power Corporation: www.dei.gr; Ministry of Environment, Physical Planning and Public Works: Climate Change; Greek Association of RES (Renewable Energy Sources) Electricity Producers: www.hellas.gr